Sprint 8, Week 2: Full Commit
The scholarship is real, the teaching chapter is closing, and Q2 is already running. Long-form sprint log on Substack.
May 10 — May 23
4/12 Done
✅ Done (4)
🚧 Doing (4)
📋 Next (4)
May and June are not for opening ten new fronts. They are the runway before July. Sprint 10 is about protected work catch-up, doctoral preparation, Techs in the City field presence, and the first real monetization experiments. Teaching stays documented, but Spring 2026 is closed and archived.
Final grades are in. Spring 2026 is archived. The runway now is protected work catch-up, doctoral prep, and making Techs in the City feel real before July tightens the schedule.
📅 SA Tech Calendar → devsa.community
"Support local. Show up. The pipeline starts with community."
July is the pressure point. Remote work begins. The doctoral load gets heavier. This window is for catching up at work, locking in school systems, establishing Techs in the City, and narrowing business experiments before the next load spike hits.
Ahead:
Runway is not downtime. It is setup before the next load spike.
GitHub Contributions
🎯 Velocity